With civil war ending in 2002 after twenty-seven years of strife, peace has created an opportunity for the country to move resolutely towards multiparty democracy and a free-market economy. With vast oil and mineral wealth, due to a large extent to the commodity boom which saw market prices for oil reach record level in 2008 and revenues from diamond mining increase exponentially, the pace and scale of the country’s economic growth are phenomenal. Angola has registered double digit economic growth, placing it as the fastest growing economy in the SADC region, with a record 23.3% registered in 2007 and sustained in 2008.
Further, the rapid political and economic transformation reached an important milestone with the holding of legislative elections in September 2008, the first in 16 years, helping the country to consolidate the political stability Angola has enjoyed since 2002. Ten political parties and four coalitions contested the elections, and the results confirmed the legitimacy of the two main parties. The governing party MPLA recorded a landslide victory, with 82% of the votes, with the second party UNITA coming in far behind with only a 10% score. The decisive win allows the MPLA to achieve more than its desired two-thirds majority in the National Assembly, giving it the platform to pursue an ambitious program for economic and social transformation. A process is underway with a view to change the Constitution and prepare for future presidential and local elections. Efforts to consolidate quasi one-party dominance in Government were achieved through a cabinet reshuffle held in October 2008. It is worth noting that with the new elections, the gender balance has improved considerably, with 39.9% of women in Parliament, and 18 women as cabinet ministers and vice-ministers, representing 22% of the cabinet, placing Angola at the forefront in gender balance in the sub-region and in 8th place in the world for parliaments. Angola has also exercised a leadership role in the SADC region and among the African lusophone countries, increasing thereby its international legitimacy and political influence.
While the current global financial crisis has imposed constraints on all countries, Angola’s progress is expected to remain significant but fragile. A number of measures have been taken to restructure the budget and reinforce efforts for more effective management of public affairs. Summary on progress towards UNDAF outcomes
The year 2008 represented the last year of the current UNDAF. It offered opportunity to assess to way in which the UN could direct its efforts towards development assistance to Angola. It also confirmed the need to define indicators against which UNDAF outcomes and outputs will be measured. More focus on Monitoring and Evaluation was also deemed a priority, with each agency investing in building M&E capacity. Efforts toward the effective formulation and implementation of joint programme were also deemed a major priority, creating a mechanism for agencies to deliver as one, and to move progressively away from project-based programming and from fragmentation of operational activities. In preparing the new UNDAF document, effort was invested to ensure coherence with the national strategic plan and an active participation of national stakeholders. The 2009-2013 UNDAF Framework is aligned with the medium-term National Strategic Plan. With the UNDAF now finalized, an operational document will be prepared to ensure a common set of guidelines against which activities and actions will be measured. These operational guidelines will define the manner agreed upon by the agencies in which respective agencies will operationalize the UNDAF at country level, to deliver on the five UNDAF main Results. Summary on progress in UN Reform
Overall, progress on UN reform in Angola is well underway; in spite the challenges and constraints in sustaining a forward movement. A key element is the positive mindset of the UNCT, which continues to look for opportunities for working together as a cohesive team and to approach challenges in a pragmatic manner. Efforts continue to be invested to reinstate a respected position for the UN with the Government of Angola, in a country where multilateral cooperation is of secondary priority, and to increase the visibility and relevancy of the UN system. The high vacancy rate among Heads of Agency (due to a relatively long clearance process) and the high mobility of staff, both national and international, (due to very high cost of living and non competitive local salary scale) have hampered somewhat the dynamics of the team. During 2008, among eight positions of HoA, five posts were vacant, with hiatus period ranging from six to 18 months. To-date, two vacancies are still awaiting government clearance. Efforts to sustain the regular participation of non-resident agencies (NRA) to the work in the country team continue to be a priority, with encouraging results already registered with the active involvement of UNESCO and UNIDO. Recent approval of a MDG-F joint programme will ensure also the active participation of ILO. The UNCT was also successful in advocating the return of UN HABITAT to focus inter alia on the fast growing housing industry, particularly on housing rights and land tenure. A MOU was signed between the Government of Angola and UN-HABITAT and funding made available by Angola for a three-year period.
The most significant development was the formulation of the new UNDAF, guided by the review of the current UNDAF and the analysis of the major challenges to achieving the commitments to the MDGs. The process of formulating the new UNDAF was launched with the support of the RDT through the technical support of UNFPA as chair of the QSA. The participatory and consultative process offered an opportunity for agencies to come together and work with key national stakeholders, and the acceptance of the GoA to participate in the process brought legitimacy to the team effort and demonstrated stronger effort at harmonization with national priorities.
The core strategic elements of the UNDAF will address outcomes in the areas of Governance, Access to integrated social sectors, strengthened national capacity in the fight against HIV/AIDS, and sustainable economic development. The period of the new UNDAF is harmonized with the draft national medium-term Development Plan and aligned with the CPAP of UNFPA, UNICEF and UNDP. The three CPD/CPAPs were submitted for approval at the same time (September session) to the respective executive boards of the Agencies concerned, and prior to that, a joint meeting was held locally with key donors and stakeholders to present the CPD/CPAPs. The GoA has agreed, for the first time, to sign the UNDAF and the respective CPAPs, a significant achievement since previous documents were not formally endorsed by the Government of Angola.
During 2008, the collaborative effort with respect to joint programme has focused on the work of the Joint UN team on HIV/AIDS. While the experience has been limited in its application of Joint Programme guidelines, the process itself has helped to build a first step toward undertaking more formal joint programmes. In this respect, approval was received in December 2008 for a Joint Programme formulated jointly by UNICEF, UNDP, ILO and IOM under the Spanish MDG-F modality. The implementation of this joint programme in the area of Water and Sanitation will further enhance agency collaboration and government national ownership of the process. A second joint programme under the same funding modality has also received approval and the process of formulating a programme document in the area of Children, Food Security and Nutrition is underway under the leadership of UNICEF, with the joint participation of FAO, WHO, IOM and UNDP.
To circumvent the failure to mobilize funding from agencies for the joint funding of a post of Coordination Officer, funding was obtained through the Spanish MDG fund. A JPO Coordination Officer has been selected and will be available by mid-year. Nonetheless, there is need to address the critical shortage of professional staff in the Office of the RC, with no support for over a year.
With respect to HACT, the UNCT has focused on preparation leading to the roll-out of this important modality, investing in the first phase of assessments, with the macro assessment conducted. This exercise is of priority to the UN Programme (Ex-Com) agencies, with UNICEF playing a leadership role in leading the process and contributing a large portion of the shared funding. There is a need to invest in immediate capacity building from the outset, with significant cost savings in the longer-term for our national partners.
The UNCT has also invested in the establishment of a number of common services in the UN building that serves as common premises for five of the eight resident agencies, and liaison offices for two NRA. The link between the Operations Management Team and the UNCT has been strengthened, creating more buy-in for decision making on common services issues. Services for banking, office cleaning, security and travel services have been harmonized creating opportunity for potential savings and operational efficiency gains. The UNCT continues to strive to support a coordinated response to disaster management. To this end, the UN Disaster Management Team has been revived, with roles and functions further defined and a coordinated response strategy in support of national efforts. The DMT was successful at mobilizing funding through the CERF modality in 2008 in response to flooding in a number of provinces of Angola.
With respect to UN Security of staff, the UN SMT has been considerably strengthened and regular meetings are held with active participation of Heads of Agency and continued information and advocacy to UN staff. Proper security planning/monitoring is now in place with an adequate response strategy in support of security preparedness. It is unfortunate that during 2008, the decision was taken to transfer the post of Senior Security Adviser to another duty station, leaving a relatively junior team to manage security in a Phase I post.
The UNCT advocated the return of UN DPA during the legislative elections. Although the Government of Angola did not request electoral assistance, the presence of DPA/EAD during the elections offered an opportunity to initiate dialogue with electoral officials since 1992, when the UN was seen to have “abandoned” Angola in the aftermath of the disputed legislative elections. The UN DPA/EAD mission was seen as an opportunity for the UN to rebuild and recalibrate its relationship with Angola, both at the operational level (through the provision of expert electoral assistance) and at the strategic level (through helping the country define for itself a positive role in the sub-region and on the African continent).
The closure in 2008 by the Government of Angola of the UN Office of Human Rights leaves a gap which some international partners are pressing the UNCT to fill. Opportunities are being explored to build national capacity to assume a monitory or advocacy role on human rights. On-going activities on civic education and support to decentralization can also serve to strengthen further cooperation in this important area.
All efforts at renewed UN implications with Angola will continued to be pursued, both in support of the country’s robust development agenda and in effort for increased political engagement. Key aspects of the proposed 2009 workplan
The key aspects of the 2009 Workplan draw primarily on a number of key deliverables for which funding is expected from both DOCO and the Agencies cost-sharing. They cover primarily the areas as follows:
• Support to operationalization of UNDAF, through the formulation of the operational guidelines and the holding of a joint annual review of respective country programmes against UNDAF priorities • Develop an interagency UNDAF M&E mechanism and methodology • Support the Government of Angola in the preparation of the 2009 MDG Progress Report, the first after a long hiatus. • Continue the MDG Advocacy campaign • Pursue to finalization of HACT assessment and roll-out • Highlight the UN role and its comparative advantage through increased advocacy, Observance of special UN celebrations, organization of forum for discussions and creation of a UN Website. • There is a critical need to strengthen the office of the RC, through the recruitment of a Senior Coordination Officer. While efforts have been made to obtain funding from the Spanish MDG for the position of a JPO Coordination, the Office of the RC is in critical need to strengthen its capacity. There has been no Coordination Officer for over a year, and efforts to obtain agency cost-sharing were met with resistance. With the implementation of two recently approved MDG-F Joint Programmes and the operationalization of the UNDAF, the function of a Senior Coordination Officer is of critical importance.
|
| 2008 Workplan |
| KEY RESULTS AREA |
Expected Outputs |
Perf. Indicators |
Actual Outputs at Year End |
Funds required/spent at Year End |
Additional support needed from HQ or Regional Director's Team |
Target Date |
| SRC |
UNCCF |
UN Agencies |
Other |
| Req |
Spt |
Req |
Spt |
Req |
Spt |
Req |
Spt |
Q1 |
Q2 |
Q3 |
Q4 |
| Coordination for Results (WORKPLAN09) |
| UNCT Contribution to the National Development Plan/Poverty Reduction Strategy/MD and MDGs plan |
UN support to formulation/implementation of relevant national strategies or plans e.g. JAS/NDP/PRSP |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
UN plan to support the implementation of the Millennium Declaration, including scaling up MDG initiatives * |
- Supported Government to MDG Report 2009 preparation.
- DevInfo effectively used as management tool to monitor the MDGs in Angola. |
- MDG report 2009 released.
- DevInfo software offically adopted by the Government. |
|
$8,000.00 | |
$0.00 | |
$0.00 | |
$21,000.00 | |
|
|
|
|
|
UN support to capacity development strategies |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
UN assistance to national authorities for the preparation of the national report on the implementation of the Brussels Programme of Action of LDCs 4 * |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Formulation/implementation of a transition plan or strategy 5 |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Aid Coordination / Management / Paris Declaration |
Planned efforts to making use of national systems in the areas such as programme/project reporting, PRS/sectoral monitoring and evaluation systems, annual PRS/sectoral performance reviews, national procurement systems, etc |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
UN support to aid coordination/management |
Improved access to donors for UNCT agencies and strengthened coordination and information sharing with regard to fundraising effort. |
Amount, projects and staff posts locally funded. |
|
$2,500.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| UNDAF/Common Programming |
Efforts to align UN programme cycle with national development cycle * |
|
|
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Preparation of CCA/UNDAF |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Implementation of UNDAF M&E framework * |
- Ensure that M&E indicators and systems are integrated with UNDAF Result Matrix.
- UN M&E Working Group more operational and sthrengthened through recruitment of more M&E Officers by the UN Agencies. |
All 2009-2013 UNDAF indicators with baseline, target and monitoring plan / responsive. |
|
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
UNDAF Annual Review/ UNDAF Evaluation |
Supported operationalization of UNDAF |
Formulated operational guidelines and hold Joint Annual Review of respective CP against UNDAF priorities. |
|
$8,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Progress towards UNDAF outcomes (drawing from your UNDAF Annual Review) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Joint Programmes6 |
Preparation/ implementation of new Joint Programmes * |
Joint UN programes adequated to respond to Government challenges and provide a cost-effective support. |
Joint programmes / Joint projects and modality Revision. |
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
M&E of Joint Programmes |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| HACT |
Plan for the roll-out/implementation 7 of HACT in the country * |
HACT effectively implemented by the EXCOM Agencies |
Micro-assessment completed
Hired dedicated staff to carry out the assessment.
Conducted partners training |
Use of FACE for cash transfer. |
$0.00 | |
$0.00 | |
$0.00 | |
$45,000.00 | |
|
|
|
|
|
Strengthening national systems/capacities through HACT |
National capacity strengthened. |
- Trainings conducted.
-Macro-assessment consolidated. |
|
$0.00 | |
$0.00 | |
$0.00 | |
$45,000.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Gender Equality |
UN support to incorporation of gender equality in national planning processes (such as National Development Strategies; PRSPs; SWAPs; Joint Assistance Strategies, etc.) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Capacity development for Gender theme groups to support UNCT to respond to national priorities for gender equality. |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| HIV/AIDS |
Establishment of Joint UN Team on AIDS and implementation of joint programme of support on AIDS * |
Effective functioning of the UNTG/UNCT, the Joint UN Team on AIDS/UN Joint Programme of Support on AIDS (UNJPS), and the 2008 and 2009 Joint Annual Work Plans implemented. |
UNJT reports and minutes of the meetings. |
|
$1,000.00 | |
$0.00 | |
$0.00 | |
$10,000.00 | |
|
|
|
|
|
Establishment of Joint UN Team on AIDS and implementation of joint programme of support on AIDS * |
UN Joint Team on AIDS capacity assessment conducted.
UN Joint Team on AIDS Capacity development Plan developed and implemented ( UN learning strategy-Prevention training- M&E workshop including CRIS utilization- AIDS & development)
Development of UNJ Program of Support (UNJPS),
|
Program endorsement by UNCT & Government
Institutional framework, common M&E framework developed
|
|
$1,000.00 | |
$0.00 | |
$0.00 | |
$10,000.00 | |
|
|
|
|
|
UN support to the national response to AIDS through strengthening the Three Ones * |
Advocacy for the Three Ones effective implementation (National & provincial level)
Advocacy plan for and facilitate all partners alignment and participation to the Joint Annual Programme Review |
Effective participation of main partners
Joint Annual Programme Review report
|
|
$3,000.00 | |
$0.00 | |
$0.00 | |
$5,000.00 | |
|
|
|
|
|
HIV/AIDS in the Workplace * |
Technical support for the development and implementation of the 2009 work place programme provided |
Learning plan developed |
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Human Rights |
Application of Human Right Based Approach |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Strengthening the capacity of UNCTs to support national human rights protection systems |
Improved capacity of UNCT on the Human Rights Capacity systems. |
Number of institutions / staffs trained. |
|
$0.00 | |
$0.00 | |
$0.00 | |
$5,000.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Common Services and Premises |
Planned initiatives to increase cost-effectiveness of UN operations, incl. common administrative services and common arrangements in support of programme delivery (including Joint Office initiative) |
Added more three new common services: Vehicule maintenance, garrage for maintenace equipment & procurement. |
The three services operational.
|
Long Term Agreements (LTAs) signed. |
$0.00 | |
$0.00 | |
$0.00 | |
$8,000.00 | |
|
|
|
|
|
Planned initiatives on common premises |
Enhanced security of the common permises |
Restored entrance in the UN Building.
Visitors properly received |
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Other (specify) |
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Coordination of Emergency Preparedness and Relief (WORKPLAN09) |
| Preparedness |
Coordination of emergency preparedness efforts of UNCT members and relevant humanitarian actors |
Enhanced Disaster Management team under UN leadership. |
Coordinatiom meeting held and funds mobilized. |
|
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
| Relief |
Coordination of humanitarian operations |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Establishment of Humanitarian Country Team |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Development of a response plan |
Increased preparedness crisis prevention and natural desasters. |
Long term disaster management plan elaborated. |
|
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Advocy |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Resource mobilization |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| UN Advocacy and Resource Mobilization (WORKPLAN09) |
| Joint UNCT Advocacy and Communications |
Development/implementation of the UNCT communications/advocacy strategy & plan |
UNCT joint communication / advocacy plan prepared and implemented. |
Improved awareness about the UNCT activities and MDGs within the government and general public. |
|
$2,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Joint UNCT Resource Mobilization Strategy |
Development/implementation of RM strategy |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Security Management (WORKPLAN09) |
| Security |
Duty station specific security risk assessment (SRA) for all locations in the country where UN staff are present |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Implementation of mitigating measures as identified in SRA |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Up to date security plan |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Security Management Team |
- Improved access control in the UN building
|
- Redesign of the entrance
|
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Implementation of security training for staff |
- Increased staff security awareness |
- Training sessions, security breifings and security advisories undertaken |
|
$0.00 | |
$0.00 | |
$0.00 | |
$5,000.00 | |
|
|
|
|
|
| Non-Resident UN Agencies (WORKPLAN09) |
| Special measures to integrate non-resident UN agencies in UNCT processes |
Supporting the Involvement of non-resident UN agencies in the national strategic planning processes/ UN programming |
Active participation of non-resident agencies in the common country programming process ensured. |
Degree of NRA implementation activities. |
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Coordination Capacity of the UNCT (WORKPLAN09) |
| Strengthening UNCT Coordination Capacity |
RCO Staffing |
-Secure funding and recruitment of a JPO Special Assistant to RC
-Secure funding for National DevInfo Database Manager (ALD3)
-Secure funding for Executive Assistant to RC (G5)
-Secure funding for Finance Assistant (G3 Service Contract)
-Secure funding for RC driver (G3)
-Secure funding for RC Office driver (G2) |
-Finance secured
-Finance secured
-Finance secured
-Finance secured
-Finance secured |
|
$89,864.00 | |
$77,896.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Materials/Equipment |
- RC Office activities ( Coordination, UNCT supporting mission, etc...)
|
- Implementation rate of this workplan. |
|
$7,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Training of UN staff |
Improved capacity of UN M&E Working Group |
Staff trained on Joint Programmes, gender related issues and DevInfo technology. |
|
$6,261.56 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
|
| TOTAL |
|
|
|
|
$143,625.56 |
|
$77,896.00 |
|
$0.00 |
|
$154,000.00 | |
|
|
|
|
|