1. Major political events Nigeria is a federal democracy based on three tiers of government – federal, state and local governments. It currently maintains a 36-state federal structure in addition to the Federal Capital Territory, Abuja and 774 Local Governments.
Efforts to routinize electoral democracy have been periodically undermined by the incessant incursion of the military into governance, whereby Nigeria has been under military rule for 30 out of the last 47 years of its post-independence life. The return to civil rule in May 1999 rekindled hopes that a stable democratic order is on the horizon.
April 2007 saw Nigeria conduct its third successive election since the return to constitutional rule which has ensured transfer of power from one civilian president to another at the national level and the emergence of many newly elected governors at the state level. Although the elections have been widely regarded as flawed, lacking in credibility, freedom and fairness, Nigerians have demonstrated their abiding faith in the constitutional process with aggrieved candidates and political parties seeking redress at the various election tribunals. Notably, the country’s two largest opposition parties, the ANPP led by former Head of State General Muhammadu Buhari, and the Action Congress (AC) of former Vice-President Atiku Abubakar have instituted legal processes challenging the results of the elections at the election tribunals.
Proceedings of the election tribunals are being keenly observed by the general public, The tribunals have so far annulled and requested for the re-run of Governorship election in six of the 36 states of the federation, while the apex court has ordered the outright removal of governors in two states – Anambra and Rivers. Meanwhile, President Yar’Adua has publicly acknowledged some of the electoral flaws and has severally affirmed to allow the rule of law to prevail, previously, he tried unsuccessfully to put in place a Government of National Unity as a means of assuaging the ill-feelings arising from the elections.
There are strong indications that the emerging democratic context in Nigeria provides an opportunity for addressing the numerous problems facing the country. For instance, President Olusegun Obasanjo who handed over power in May 2007 initiated a series of wide ranging economic and political reforms. The momentum for economic reform has continued under Nigeria’s new administration. Since taking office, the administration has embarked on the process of harmonizing its principal strategy documents: including the Presidents 7 Point Agenda, Vision 20-20 and the draft PRSP II, into one comprehensive development policy framework.
Nigeria signed the Paris Declaration on Aid effectiveness in 2007. In line with the spirit of the Paris Declaration the UNCT held off the preparation of its second United Nations Development Assistance Framework (UNDAFII), in order to align this with the preparation and harmonization of Nigeria’s development policy framework. Summary on progress towards UNDAF outcomes
3. Highlights on progress towards UNDAF outcomes Important advances were registered in the course of 2007 in each of the UNDAF Outcomes, some of which we highlight here for illustrative purposes more details of which are available in the 2007 Results Table located in the Annexe. Progress towards UNDAF-I outcomes achieved over the course of 2007, is indicative of the important steps being taken towards the achievement of operational and programmatic coherence within the UN system.
Overall, significant contributions were recorded as a result of plans developed and in many cases implemented by clusters of UN Agencies in the areas of Health, Education, Gender and the fight against HIV and AIDS amongst others. In the area of Health, 2007 saw the UN make a major contribution to the increase in routine vaccination coverage (DPT3) from 37.5% by December 2005 to 69% by December 2007. Important advances were also recorded in the area polio eradication, the work of the UN making a significant contribution to the 80% reduction in the wild polio virus burden recorded in 2007 compared to beginning of 2006.
In the area of Governance, 2007 saw the UN support the first report on the State of Human Rights in Nigeria published by the Nigerian Human Rights Commission based on the outcome of the Human Rights Monitoring exercise conducted in 2006. Furthermore, the UN provided assistance that was instrumental in facilitating the passage of the Bill on Public Procurement into law by Nigeria’s legislative arm thus establishing a statutory framework for public procurement.
In the area of Gender, the UN provided significant support to the development, finalization and launching of the National Gender Policy launched in May 2007. Extensive technical support was similarly provided to the development of Nigeria’s 6th Country CEDAW Report presented to UN committee on CEDAW.
In addition to the above, in the area of upstream policy advice, the UN system jointly supported the Federal Ministry of Health to develop its Integrated Maternal, Newborn and Child Health (IMNCH) strategy. Similar support was provided in support of the development of the National Population Action Plan, the National Policy on School Health and the mainstreaming HIV and AIDS and Gender into development and poverty reduction documents.
Building upon the ‘lessons learned’ from UNDAF I, establishing closer linkages between UN reforms and common country programming has been a central theme in the plans being developed for the operationalization of UNDAF II. As noted above, the establishment of the PMT represents the first major organizational innovation developed by the UNCT, towards the implementation of the programmatic dimension of the UN reform.
The second major organizational innovation, endorsed by Nigeria’s UNCT in the context of Nigeria’s UNDAF preparation, is the concept of Strategic Program Frameworks (SPF’s). The basic idea behind the SPF is that, the implementation of programmes, clustered around each of the four thematic areas of UNDAF II, described above, be centrally managed and monitored on by small inter-agency teams.
Summary on progress in UN Reform
2. Highlights on progress in UN Reform Over the course of 2007, the UN in Nigeria concentrated upon the adoption of the key recommendations contained in the 2007 TCPR. In this regard a number of important advances have been recorded, described in more detail below.
2.1. Alignment with National Development Process and UN support to key elements of Nigeria’s Development Policy Framework As noted above, in aligning the preparation of our second UNDAF with that of Nigeria’s second PRSP, also known as the National Economic Empowerment and Development Strategy (NEEDS), the UNCT sought to strategically position the weight of the UN’s developmental support to Nigeria. On one hand, alignment enabled the UNCT to contribute ‘as ONE’ to the development of the NEEDS II document, including inter alia the provision of a consolidated UN review and assessment of the draft NEEDS II document. On the other hand, closer alignment has enabled us to focus more of our development assistance from 2009, on Nigeria’s stated national priorities in which the UNCT’s has a demonstrated comparative advantage.
In terms of implementation support, the UN provided technical assistance in a number of MDG reporting related activities including: supporting efforts to capture, refine and package MDG related data; providing training for the team of national experts who conducted Nigeria’s MDG NEEDS assessment; and assisting in the preparation of the 2006 MDG Report.
2.2. Capacity Development and Aid Coordination and Effectiveness Capacity development lies at the core of the UN’s program and policy support to Nigeria’s Federal and State level governments, instances of which are detailed in the Results and use of Funds tables in the next section. The UN has continued to lead the Donor Coordination efforts around Avian Influenza and HIV and AIDS and in so doing, has played a key role in both advocacy and resource mobilization, detailed in the next section.
2.3. Highlights in UN Coordination in Nigeria 2.3.1. Common Country Programming 2007 saw the UN in Nigeria take an important step towards the goal of ‘Delivering as ONE’, with the setting up of an inter-agency Program Management Team (PMT). Reporting to the UNCT, the PMT serves as the central body of the UN in Nigeria for the planning and monitoring development policy and programmatic collaboration across resident and non-resident agencies. Under the guidance of the UNCT, the PMT was tasked with the preparation of UNDAF II. As part of the UNDAF preparation process, and with support from UNDGO, the PMT trained over 80 senior UN program staff and government counterparts in Results Based Management and the Human Rights Based approach.
The draft UNDAF is set to be presented to the government for review at the beginning of 2008, UNDAF II is set to anchor the bulk of the UN’s programmatic work in Nigeria from 2009 to 2012. Given the wide range of Federal and State level actors and the complexity of Nigeria’s policy environment, the UNCT committed to maintaining the highest standards of participation and inclusiveness in the preparation of the UNDAF. No effort has been spared in ensuring that, as the UN’s collective response to Nigeria’s development challenges, our next UNDAF aligns with both Nigeria’s core developmental aspirations. The four areas chosen include: Governance and Accountability; Productivity and Employment; Social Service Delivery; and Conflict and Insecurity, reflecting the thematic areas covered in the UNDAF II Results Matrices.
2.3.2. Common Services & Premise & Harmonized Cash Transfers 2007 saw progress in the area of Commons Services & Premise. Achievements include: the streamlining of the management of the UN common premise; the UN wide harmonization of pay scales for Consultants; and the completion of the process of setting up one Common UN Travel Service provider in UN House. Prospects for even closer integration of our common operating systems and platforms in the areas of IT, Finance and Procurement in 2008, are strong, following the establishment of UN-wide networks in these business functions. The UN-HACT Committee is in the process of being expanded while; the first steps are underway to constitute a National HACT Committee that will oversee the conduct of the macro assessment, scheduled for early 2008.
2.3.3. Inter-agency groups and Joint Programmes Over the course of 2007, the Inter-Agency UN Communication Group (UNCG) undertook a range of an unprecedented range of activities on behalf of the UN system. Activities undertaken this year included the launching of a monthly UN Newsletter; the organization of events around last years International Women’s; UN and World AIDS day’s; and the preparation and implementation of Standard Operational Procedures by all agencies for the management of media relations; The UNCG was instrumental in organizing for the production of a range of media events and products including press briefings, print and TV media coverage and special newspaper supplements on behalf of the UN system.
The Joint UN Theme Group on HIV and AIDS is composed of Heads of UN Agencies and senior staff working on HIV and AIDS related issues throughout the organization. The Theme Group acts as a Steering Committee for the UN’s work in this area and reports to the UNCT. The Joint UN Team on AIDS is the operational arm of the Joint Theme Group and is made up technical staff drawn from across the UN system. 2007 saw the development of the UN Joint Program of support on HIV AIDS, which provided a framework for the pooling of funds and the rationalising of management structures in the 6 targeted states that the UN in Nigeria works on. 2007 also saw the JUNTA support the development of a number of State Strategic Plans, in addition to providing technical support to the elaboration of the National workplan on HIV and AIDS.
The UN Learning Team on HIV and AIDS (UNLT) falls under the umbrella of the Joint UN Theme Group on HIV and AIDS. UNLT conducted a series of important activities over the course of 2007. Supported by a cadre of Condom Focal Points drawn from throughout the UN system, the UNLT organized a number of both peer education related, training and Training of Trainer activities in the course of 2007, targeting UN staff and their families.
The Joint Program in Taraba seeks to empower returnees and other communities in Sarduana Local Government in Taraba State, by designing and putting in place a series of Rights-based interventions. 2007 saw the endorsement of the Joint Program Document that put in place the programmatic framework under which a number of activities were carried out. Key aspects of the proposed 2008 workplan
The 2008 workplan will build up on the achievements and take into account the challenges outlined in the body of this report. Recommendations
4. Conclusion To conclude, I would like to thank and commend members of the UNCT and the rest of our UN Colleagues for their tremendous support and hard work over the course of 2007. As noted in the body of the letter, the UN in Nigeria has made important strides in the direction of delivering as ONE in a number of areas. This, alongside the dedication and hard work of all our colleagues both in Nigeria and beyond, has set the stage for significant improvements in the coherence and focus of our operational activities, taking us a step closer to delivering as ONE.
I would like, on behalf of the UNCT to thank the UN family and Head quarters in New York for its continued support and assistance l look forward to ongoing cooperation over the coming year.
|
2007 Results and Use of Funds
| 2007 Results and Use of Funds |
| Part One: Progress towards UNDAF outcomes (Results 2007) |
| Key Result Area |
Outcome |
Name |
Comments |
| UNDAF | Outcome 1 | Strengthened national capacity to ensure access to quality health care systems for all Nigerians | On track | |
| UNDAF | Outcome 2 | People empowered through education | On track | |
| UNDAF | Outcome 3 | Institutional capacity built to plan, implement and manage multi-sectoral strategies at both national and sub national levels to limit the spread of HIV/AIDS and mitigate its social and economic impact on poor people and women and children. | On track | |
| UNDAF | Outcome 4 | Strengthened national capacity to plan, monitor and coordinate national development; promote human rights, particularly for women; promote democratic processes and accountability in governance, and promote peace and respond to emergencies | On track | |
| UNDAF | Outcome 5 | Enhanced capacity for national production and productivity for agriculture, industry and services | On track | |
| Part Two: Coordination Results |
| Key Results Area |
Expected Outputs1 |
Performance Indicators2 |
Actual Outputs at Year End |
Funds required/spent at Year End |
Additional Support Needed from HQ or Regional Director's Team |
Target Date |
| SRC |
UNCCF |
UN Agencies |
Other |
| Required |
Spent |
Required |
Spent |
Required |
Spent |
Required |
Spent |
Q1 |
Q2 |
Q3 |
Q4 |
| Result Area 1: Coordination for Results |
| UNCT Contribution to the National Development Plan/Poverty Reduction Strategy |
|
UN support to formulation/implementation of relevant national strategies or plans e.g. JAS/NDP/PRSP
|
National PRSP developed with UN Technical support and monitored |
Number of strategy meetings held with NPC Joint work plan with NPC outlining UN Technical support finalised National monitoring plan developed |
UN provided a comprehensive review of NEEDS1 UNDP supported the preparation of Zero and First Drafts of NEEDS2 |
|
|
|
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
UN plan to support the implementation of the Millennium Declaration and/or the UNDG Action Plan on the Development Outcome of the World Summit 3 (MDG Action Plan) *
|
UN technical support to MDG based PRSP with baseline data identified |
Joint work plan between NPC, National MDG office developed Technical support provided for a study on identifying gaps in baseline line data & identifying subsequent work plan to fill gaps MDG monitoring mechanism in place and MDG annual report produced |
UNDP provided technical support to the M&E Review mechanism of Debt Relief Gains (DRG) UNDP provided technical support to MDGs Office on allocation of DRG and Conditional Grants to states MDGs Needs Assessment results prepared for Nigeria A team of Nigerian MDGs costing experts constituted and developed. |
|
|
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
|
UN support to capacity development strategies
|
Capacity of NPC strengthened to produce PRSP |
National work plans in placeNational Priorities identifiedReview and streamlining exercise undertaken and implemented |
Two national experts hired for NPC on strategy development and development planning with a view to enhancing intuitional capacity of NPC. Preparation of 2006 MDG report. A Generic Macroeconomic Framework initiated for Nigeria to support macroeconomic framework of NEEDS2 and economic policy analysis |
|
|
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
|
UN assistance to national authorities for the preparation of the national report on the implementation of the Brussels Programme of Action of LDCs 4 *
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Formulation/implementation of a transition plan or strategy 5
|
Not applicable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Aid Coordination / Management / Paris Declaration |
|
Planned efforts to making use of national systems in the areas such as programme/project reporting, PRS/sectoral monitoring and evaluation systems, annual PRS/sectoral performance reviews, national procurement systems, etc
|
Potential during support to developing PRSP identified
|
Agreement with incoming Government formulated
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UN support to aid coordination/management
|
UN System strategy to support aid coordination produced
|
Number of strategy meetings held with NPC & development partners Priorities identified & UN share of priorities agreed & documented
|
UN provided a comprehensive reveiw of NEEDS1 UNDP support the preparation of Zero and First Drafts of NEEDS2 |
|
|
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| UNDAF/Common Programming |
|
Efforts to align UN programme cycle with national development cycle *
|
UNDAF II aligned with national priotiries & cycle aligned with PRSP, documented and & adopted by Government
A CCA & UNDAF that strategically aligns the UN with national response positions the UN with development partners documented and disseminated |
Planning workshops with NPC & line ministries Signed agreement with Government
Dialogue with Government Number Joint workshops to identify staregic priorities held Number of PMT meetings held |
UNDAF cycle aligned with PRSP
UNDAF Results reviewed and endorsed by Government as being fully consistent with the government s national development framework |
|
$15,000.00 |
|
|
|
|
|
|
|
|
|
|
31/03/2007 |
|
Preparation of CCA/UNDAF
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Progress towards UNDAF outcomes (inputs provided by theme group chairs) *
|
UNDAF outcomes (matrices) aligned with UNTG & UN agency work plans |
Theme Groups & ToRs reviewed by PMT Theme Group work plan for UNDAF implementation developed Monitoring Plan & Calandar to be developed and implemented |
UNDAF outcomes used as the basis for the development for 2008 Theme Group and inter-agency work-plans |
|
|
|
|
|
|
|
|
|
31/03/2007 |
|
|
|
|
UNDAF Annual Review/ UNDAF Evaluation
|
Quarterly reports on progress towards outcomes submitted
UNDAF Annual Review conducted |
Documents finalised & disseminated |
Not done
Done |
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
Quality CCA/UNDAF incorporating HRBA, RBM etc produced
UNCT Retreat |
UNCT oriented Ongoing training for UN programme staff undertaken RC annual work plan 2007 reviewed, UNDAF annual evaluation reviewed, priorities for 2008 work plan developed
UNCT Retreat |
Draft UNDAF produced
2 training workshops on HRBA and RBM covering over 50 UN staff and government counterparts organized
Done |
|
$52,000.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
| Joint Programmes |
|
Preparation/ implementation of new Joint Programmes *
|
All programme outputs realised by end of 2007 "Civic-voter education strategies & materials prepared and distributed. Completed voter register lists; Election organized with high turnout and considered free and fair by international standards. Reduced number of election-related conflicts and disputes compared to previous election. " Joint programme on Taraba addressing the recurrence of ethnic/communcal conflicts by fostering peace and reconciliation, human rights, protection of miniroity groups through the empowerment of male & female returnees & other communities delivered Techncial Assistance & support to the elections to ensure that gender/civil society observation is addressejoint programme delivered To contribute to Nigeria’s strategy to foster the rapid growth of domestic private sector as engine of growth, source of employment generation and of poverty reduction joint programme initiated Joint programme on Avian Influenza finalised & funded harnessing comparative advatage of Fao, WHO, UNICEF, UNDP & RCO • Returnees and other communities as well as other stakeholders sensitized on human rights, child protection, protection of minorities and groups with specific needs for reconciliation and sustainable peace through workshops carried out by Institute for Peace and Conflict Resolution (IPCR); • Technical assistance provided for solution of land disputes out of courts and to strengthen Legal framework to address the land disputes; • Community Centers constructed and operated in returnee areas of Sardauna Local Government Area; • Primary schools and Basic health facilities rehabilitated in returnee areas of Sardauna Local Government Area; • Spring water facilities constructed in returnee areas and water treatment plant in Gembu rehabilitated; • Two small power plants with capacity of 430 KVA and 230 KVA constructed/installed at Tunga dam; • Gembu Power Plant rehabilitated and made operational for provision of electricity to returnees and other communities in Gembu; • The people, public institutions, businesses, community organizations and other groups with interests in the local economy Identified by ILO; • Goals, objectives, programs and projects reflecting the realities of the local economy in Sardauna Local Government Area and the capacities of community identified through SWOT analysis; • Low Income or Hard-to-Employ Workers including disadvantaged groups integrated with special attention on women, redundant workers, the long-term unemployed and youths by ILO; • Milk Processing and agro-processing units installed at Kakara; • Capacity of existing and new cooperatives associations built to contribute directly to poverty reduction through job creation and promotion of economic initiatives by the local population; • New skills in agriculture production introduced to returnees and other communities in Sardauna Local Government Area; • Open pollinated maize, NERICA rice and vegetable seeds procured and distributed to farmers in Sardauna Local Government Area; • Technical capacity of farmers and grazers built to increase production; • Animals in returnee areas vaccinated and community animal health workers trained; • Grinding machines and honey preservation/cleansing equipments procured and distributed among returnee and other women; • Existing government structures at both State and Local Government levels are strengthened to support women’s empowerment strategies; • Gender trainings organized for returnee and other communities women and girls; • Sexual and Gender Based Violence (SGBV) trainings conducted as a preventive measure; • Capacities of cooperative associations built to benefit from Credit and savings facilities for small businesses as well as to develop culture for saving excess funds; • Reproductive health status of women in Sardauna Local Government Area assessed; • Awareness campaign carried out to sensitize the returnees and other communities on the strong potential for incidents of recruitment of youths for the purpose of trafficking in persons by UNODC; • Rapid assessment of the HIV situation carried out in Sardauna Local Government Area; • HIV prevention and care integrated into all reintegration, rehabilitation and reconstruction activities targeted at returnees and other communities; • State workplace policy and programme on HIV/AIDS developed using the ILO Code of Practice on HIV/AIDS in the world of work and the national workplace policy on AIDS; • Capacities of elected leaders of the existing and new cooperative associations built through workshops and training sessions to fight HIV/AIDS/STIs; and • SACA, LACA and civil society organizations’ capacity/collaboration strengthened to plan, implement and monitor HIV prevention, treatment, care and support interventions in Sardauna Local Government Area. |
Scoping mission from NY conducted, recommendations docuemnted & disseminated Workshop to update & finalise document & common work plan held Final draft produced Comments incorporated proposal shared with donors
• Workshop with leaders from all ethnic groups and returnees conducted in Jalingo; • Workshop with all communities (represented on the basis of gender and age groups) involving all ethnic groups carried out in Gembu; • Agreed communiqué, jointly signed by all communities for peaceful coexistence signed and issued. • Resettlement Committee members trained; • Land disputes successfully handled by the committee; • Women adequately represented on the committee. • Training organized for the courts staff dealing with land disputes. • Community Centers are functional in Gembu, Mayo Ndaga, Dorfi, Kabri and Mbamga & Bang Three Corner • Primary schools in Gembu, Kakara, Dorfi, Kabri and Mbamga & Bang Three Corner rehabilitated. • More students (both male and female) are attending schools in returnee areas. • Basic medical facilities in Gembu, Kakara, Dorfi, Kabri and Mbamga & Bang Three Corner rehabilitated. • Both returnees and other communities (both male and female) are getting basic medical services in returnee areas. • Rehabilitation of water treatment plan in Gembu completed; • Construction of spring water projects completed in Gembu, Mayo Ndaga, Dorofi, Kabri, Mbamga and Bang Three Corner. • Feasibility Study showed a high rate of return on this investment; • Tunga Power Project Company incorporated for implementation of the project; • Two Power Houses became operational by July 2006. • Sub-agreement with NCFR signed; • Gembu Power plant rehabilitated • Handing over to local Government completed • Returnees and other communities are having electricity supply • The ILO completes the resource audit for the returnees and the other communities as a prerequisite for economic empowerment initiative • The ILO completes the resource audit for the returnees and the other communities as a prerequisite for economic empowerment initiative • Implementation of the LED strategy by the local community and all the various stakeholders taking cognizance of a consistently and rapidly changing environment. • Many disadvantaged groups without employment and a large proportion of workers in the informal sector established in basic skills of business management, finance and marketing with a significant impact on the local community. • Certain number of women helped to access employment and self-employment programs through skills development, confidence building programs centers established within the community for sustaining the gains made • The ILO completes the resource audit for the returnees and the other communities as a prerequisite for economic empowerment initiative • Adoption of the LED strategy by the community and the stakeholders as a framework for action Communication of the strategy to all members of the community as well as collation of feedback on the LED strategy from the communities • Implementation of the LED strategy by the local community and all the various stakeholders taking cognizance of a consistently and rapidly changing environment • Many disadvantaged groups without employment and a large proportion of workers in the informal sector established in basic skills of business management, finance and marketing with a significant impact on the local community. • Certain number of women helped to access employment and self-employment programs through skills development, confidence building programs centers established within the community for sustaining the gains made through the LED initiative • Ownership and operational management of milk processing plant successfully negotiated with returnees and local communities; • Milk Processing plant installed and it started functioning at Kakara; • Grazers were bringing their milk to collection points. • Returnees and other communities have more disposable income • Agro-processing unit installed and working successfully at Kakara; and • Ownership and management of agro-processing plant clearly defined and agreement signed. • Specific Number of new associations established • Specific Number of associations involved in capacity building programmes • Specific Number of women association technically assisted • Adaptability and acceptance of farmers to adopt and utilize new skill. • Fifty farmers trained for seven days by two trainers as (TOT) • 30 metric tones of hybrid maize procured and distributed among 1200 farmers. • 30 metric tones of rice seeds procured and distributed among 600 farmers • 700 farmers received carrot seeds and cultivated; • 700 farmers received tomatoes seeds and cultivated; • 300 farmers received ugwu seeds and cultivated; 400 farmers received hot peppers seeds and cultivated; • Income of 2,100 farmers increased due to cultivation and marketing of vegetables |
Capacity Building for National Commission For Refugees (NCFR) to include the following activities: • Hold a mock Community Meeting with NCFR to establish their views, and address how they will cope with community suggestions. • Work together to make a draft outline of a curriculum from which the community ideas can be inputted. Spend time discussing and listing the materials that would be required for various potential activities that may come up in the curriculum. • Participants write down attributes that they would look for in selecting various members of the community for specific responsibilities, such as teachers, accountants. This can be used when identifying with the community who can play these roles. • Hold a FGD with NCFR on methods of supplying and maintaining power and water to the community centre, how will it be financially affordable, who is responsible for managing overhead costs, paying bills, etc. This FGD can later be replayed with community members to uncover their comments and suggestions. • Determine how it will be possible to choose people to be trained and how funding for these future vocational training courses can be achieved in a sustainable manner. • Develop a framework for monitoring and evaluation of the training courses; look at how can introduce accountability in the centres for the procured equipment and discuss methods for centre security and for maintenance/care of equipment. • Look at how to initiate a “Sales Network” for the production and distribution of the products made within the centres. Set up group activity with stickers indicating role of each person with the sales network and give everyone a card that details their responsibilities. Have each person stand up and read out their role, then stand in a line to show how they link up. Also indicate their linkage to others on a piece of paper.
Federal Government Support Package to UN Initiatives in Taraba State • FGN Support to Immediate Outcome 1.5: Increased access to and control of agricultural inputs and farming methods as well as marketing of agricultural produce by both male and female returnees and other community members. • FGN Support to Immediate Outcome 1.1: An enabled environment that allows male and female returnees and other communities in Sardauna LGA in Taraba State to live in peace and harmony with due respect of human rights and dignity. • Plans developed for sustainability of the programme
State Strategic Plan (SSP) on HIV/AIDS
Joint Project document was signed by eight (out of nine participating agencies) and UN Resident Coordinator on 27th October 2006.
UNHCR and UNIDO signed a MOU for purchase of equipments of two Power Plants.
Functioning of Project Management Team (PMT) and Project Steering Committee (PSC) on Taraba joint programme
Local committees (consisting of returnees and local communities and represented by men and women) in Dorofi, Bang Three Corner, Kabri and Mayo Daga were provided grinding machines (total four);
Rehabilitation of Spring water project in Mayo Daga and Dorofi
Rehabilitation of Gembu Power plant
Rehabilitation of Gembu water Plant
Construction of Community Centres in Gembu, Dorofi, Kabri,Mayo Daga, Bang Three Corner
UNHCR signed Sub-agreements with Institute for Peace and Conflict Resolution (IPCR), Arable Crop Development and Marketing Company (ACDMC) and National Commission for Refugees (NCFR) for planned activities in 2006 and 2007
UNHCR and FAO signed an MOU in 2007 for agriculture activities
FAO, UNIDO, UNODC, UNIFEM, WHO, UNFPA provided technical inputs; . TOT workshops for women and youth leaders
Workshops for capacity building on Community Development
Restoration of cattle by Arable Crop Development and Marketing |
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
M&E of Joint Programmes
|
Progress towards the implementation of joint programmes assessed |
Quarterly reports on Joint programmes submitted reporting on common work plan Reports submitted to donors |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| HACT |
|
Plan for the roll-out/implementation 7 of HACT in the country *
|
Macro assessment undertaken & results incorporated into CCA & UNDAF
|
Terms of reference finalised Consultants engaged Documented report produced
|
Delayed until 2008 to align with UNDAF II |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Strengthening national systems/capacities through HACT
|
Not applicable yet |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Gender Equality |
|
UN support to incorporation of gender equality in national planning processes (such as National Development Strategies; PRSPs; SWAPs; Joint Assistance Strategies, etc.)
|
Gender in next PRSP strengthened & National Gender Policy (2006) implmented |
Lessons learned from PRSP I incorporated into PRSP II Techncial support provided by UN to strengthen PRSP II on gender National Policy disseminated to States & monitoring mechanism developed/reports produced |
Assessment of National Economic and Empowerment Development Strategy (NEEDS) 1 on gender conducted for NPC
CSOs and women’s groups trained on engendering policy processes
UN consolidated response, including on gender to NEEDS submitted to NPC
Federal ministry of Women Affairs provided technical support for sensitization of the National gender Policy
|
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Gender theme groups able to support enhanced effectiveness of UNCT to respond to national priorities for gender equality
|
All UNCT planning, strategy & UNDAF docuemnts have gender mainstreamed |
Gender mainstreamed across UNDAF outcomes 2007-2008 Gender incorporated into M&E framework for UNDAF I Gender training of UNCT undertaken UNTG Gender work plan implemented and monitoring reports produced |
Technical support provided for Gender mainstreaming in UNDAF outcomes
Gender training of programme staff and government partners for UNDAF undertaken
Gender Profile for Nigeria developed by the UNTG
International Women’s Days commemoration organized by UNTG
|
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| HIV/AIDS |
|
Establishment of Joint UN Team on AIDS and implementation of joint programme of support on AIDS *
|
Institutional Frameowrk for HIV/AIDS Joint Programme develped, documente & operational "Joint programme on HIV/AIDS in 5 states: Increased access and availability to prevention services (UNICEF & UNFPA) Improved access to ART and care and support (WHO, UNFPA, UNICEF, UNDP) Governance, Civil society engagement and impact mitigation (UNDP, World Bank, UNIFEM, UNICEF, UNAIDS)
UN work place programme on HIV/AIDS implemented |
Frameowrk endorsed by UNCT, Work plan endorsed by UNCT, work plan operationalised & qurterly monitoring reports submitted Quarterly reports on progress submitted Number of staff accessing dispensary for treatment & support, condoms machine installed in bathrroms & number of condoms accessed, number of ongoing training sessions for staff & volunteers, agencies cost funding of work place programme |
A JUNTA Institutional Framework and Working Mechanisms on HIV and AIDS 2007-08 developed and endorsed by the UNCT
A costed UN Joint Plan of Work for HIV and AIDS for July – December 2007 developed, endorsed by UNCT and implemented
A costed UN Joint Plan of Work for HIV and AIDS for January – December 2008 developed and to be presented to UNCT late 2007.
|
|
|
|
|
|
|
$60,000.00 |
|
|
|
|
|
31/12/2007 |
|
UN support to the national response to AIDS through strengthening the Three Ones *
|
UN Institutional Support Plan for the National Action Committee on AIDS - NACA |
"M&E work plan developed and NNRIMS reports sunmitted National HIV/AIDS procurement and logistics management system developed and made operational Strengthened health Round 5 Global Fund implementedrequirement NACA’s financial management system strengthened & delivery rates of NACA funded programmes increased NACA’s human resource management system improved Coordination of national AIDS response strengthened by implementation of domestciated GTT
|
- The NNRIMS Operational Plan has been developed to facilitate implementation of the third one of the Three Ones – One M&E System. Preparatory work has started to cost the plan. In addition, States have been supported to produce quarterly M&E updates to inform policy formulation and programme implementation. So far 13 States are consistently reporting.
- Technical support was provided to the CCM to develop a sound proposal to the Global Fund Round 5. The proposal was successful and has been funded to the tune of US$180m for 5 years. This is commendable coming against a background of cancellation of the Round I phase II GFATM grant to Nigeria.
- The UNTG developed a comprehensive Technical Support Plan for NACA. The plan elaborates support in the following areas: M&E, Coordination, Procurement and Financial Management. The plan was developed in response to NACA’s needs.
- The UNTG has supported elaboration of State Strategic Plans in 4 of the six UNTG supported states – Taraba, Ondo, Kaduna and Edo. In all these SSPs, Universal Access has been integrated. The SSPs are the basis for harmonization and alignment of development partner support to state response priorities.
UNTG has supported the Joint MTR of the NSF and a 2008 to 2009 Priority Action Plan for the last 2 years of the NSF. The Priority Action Plan is to facilitate alignment of development partner support to nationally defined priorities in line with the GTT Recommendations. |
|
|
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
|
HIV/AIDS in the Workplace
|
UN work place programme on HIV/AIDS implemented |
Number of staff accessing dispensary for treatment & support, condoms machine installed in bathrooms & number of condoms accessed, number of ongoing training sessions for staff & volunteers, agencies cost funding of work place programme |
In the spirit of greater and meaningful involvement of PLHIV an HIV positive person was recruited to coordinate the UN workplace programme. The UNTG mobilized resources within the system to support the post. The contributions of the officer have compelled the UNTG to mobilize additional resources to extend the contract for another year
Organised an HIV and AIDS knowledge fair for children and spouses of UN staff
Distributed 50,400 pieces of condoms to staff and family members. To facilitate access to condoms, 18 male condom dispensers have been installed in all bathrooms in the UN House in Abuja. Capacity of 35 staff in behavioural change communication (BCC) has been developed through training. IEC materials eg posters were developed and widely distributed to complement the BCC training. As part of World AIDS Day Commemoration, the UNLT mobilized staff to know their HIV sero-status. A total of 97 staff (52 male and 45 female) were tested and 4 tested positive. |
|
$7,000.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Human Rights |
|
Application of Human Right Based Approach
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Strengthening the capacity of UNCTs to support national human rights protection systems
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Coordination of Humanitarian/Natural Disaster Operations |
|
Coordination of humanitarian operations
|
UN EPRWG capacity improved to deliver EPRWG Theme Group outcomes |
• Number of trainings completed • No of EPRWG members trained on emergency preparedness and response UNDAF annual review results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preparation of crisis prevention/natural disaster operations/plans
|
A formal structure for Emergency response established (involving UN system, national institutions and civil society groups) to respond to forced displacement and natural disasters. Early warning networks established and functioning. National capacity for early warning and crisis prevention developed • IDP policy finalized by the Government |
"• National summit held and joint communiqué issued; • National mechanism for emergency response finalized; • National Disaster Response Plan updated " Early Warning networks at Federal, Zonal, State and LGA established Number of such contacts Number of joint meetings/workshops organized. Contingency plans prepared/regularly updated. Conflict prevention and response elements of CCA/UNDAF-II implemented and quarterly reports prepared • Draft IDP policy discussed in EPRWG meetings; • Consolidated UN Comments provided. • IDP policy widely disseminated.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Contingency Plan initiatives
|
2nd UN AI Contingency Plan finalised & funded
National Contingency Plan on AI finalised & disemminated |
ToRs for UN/OCHA mission finalised, stakeholder meetings in UN held, budgted action plan finalised, UN contingency plan docuemnted, disseminated & approved, Internal resources mobilised
Stakeholder analysis completed, risk analysis completed, draft plan developed, comments incorporated from all stakeholders, workshop held to disseminate plan |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Common Services and Premises |
|
Planned initiatives to increase cost-effectiveness of UN operations, incl. common administrative services and common arrangements in support of programme delivery (including Joint Office initiative)
|
UN Procurement Network functions reviewed, redefined, and operationalised UN Human resources network functions reviewed, redefined and operationalised+C61 Common Fleet Management established A system for Common immigrations and customs clearance (MoFA protocols) established A cost recovery method for drugs introduced and functioning |
ToRs developed and approved - 2 new LTAs for procurement of common goods & services signed - Common vendors data base established
Common consultancy rates approved -Staff counseling/support network established - Common Training/Learning Plan developed - Common UN Nigeria Briefing package developed
Taskforce established - Current Fleet and manpower assessed - Current arrangement for request and provision of transport service reviewed - Feasibility of pooling resources using Process Model Approach completed - Protocols and management developed" Feasibility study undertaken - Agreement with MoFA formalised" Feasibility study completed - Proposal developed and approved |
? Network formed and inaugurated
? Signing of two new LTA- LTA for common stationeries and common courier almost ready. ? UN Procurement Network members Certification: Not done. ? Common Vendors database: On going. ? Development of TOR and Work plan: Draft TOR has been finalized and shared with UNOMT. To be reviewed/approved by UNCT
? Common consultancy rates: Finalized. ? Establishment of staff counseling/support network: On going. ? Common Training / Learning plan: Ongoing ? Common UN Nigeria Briefing Package: Almost finalized
|
|
$1,500.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Planned initiatives on common premises
|
New maintenance contract operationalised Common Travel Services in UN House outsourced and functioning Blood Bank system for the UN established and functioning UN House Operational Procedures (SOPs) in place Repair garage services contract rd & secure fuel supply contract awarded UN IT & Finace networks established
|
New maintenance contract awarded - Orientation and induction of new contractors completed " Tendering process completed - Contract awarded and approved by UNCT " Set up Blood Bank working group - Feasibility study completed - Proposal developed and approved - Blood bank established
Working group established - SOPs drafted and shared - SOPs approved
Tendering process completed - Contract awarded and approved
ToRs developed and approved - Work plan developed - Work plan operationalised"
|
? Completion of spatial analysis: Done ? UN House taskforce on space: Taskforce reconstituted by UNCT ? Contract selection/award finalized. Contractors fully on board. ? ToRs review: Finalised ? Tendering process: Finalised without success. Review ongoing. ? Contract award : Ongoing ? UN House Budget Final draft ready. To be reviewed by UNDP legal unit before final adoption. |
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Other (specify) |
|
Other (specify)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Result Area 2: UN Advocacy and Resource Mobilization |
| Joint UNCT Advocacy and Communications |
|
Development/implementation of the UNCT communications/advocacy strategy & plan
|
UN System branded products provide increased awareness on One UN Standard operational practices developed for engaging media Public & media awareness camapign conducted to raise UN profile
|
5 000 calendars, 5000 folders, 5000 face-caps, 5000 T-shirts, and 1000 are produced and distributed 10 key messages developed and used International Women Day, World AIDS Day and UN Week Website updated at least every two months 2000 kits produced and distributed
20 editors and 30 journalists trained on MDGs/ UN reform 1 radio Jingle produced in 4 local languages (Hausa, Ibo, Yoruba, Pidgin) 5 key anchorpersons of the presidential/governorship debates are sensitized" Quarterly progress reports indicating use of SOPs At least 14 UN Senior staff acquire media relations skills
• Three news supplement on a thematic issue in relation to UN Days produced • Number of media appearance of RC and HoAs increased • Press briefing on 3 major UN Days given by RC & HoA
• Media visit to project sites
• Contribute contents to UNIC newsletter
|
UNCG dropped the idea of producing calendars, caps and T-shirts, as it considered costly and ineffective.
Key messages were developed for International Women Day, UN Day, World AIDS Day.
All three UN Commemorations were duly observed. This year’s International Women’s Day was celebrated on March 7 at the UN House. There were two events; celebration at the UN House (9-12pm) and the Joint Press/Media Briefing at the Rock-view Hotels (12.30- 2pm) with Federal Ministry of Women Affairs represented by the Permanent Secretary Dr. Safiya Mohammed; NTA, AIT, DBN, FRCN, NAN, This Day Newspaper, The Guardian Newspaper, and all the Heads of Agency including the RC, participated in the two events. The RC, UNIFEM RPD and the UNICEF Director represented the UN during the Joint Press Briefing at the
Rock-View Hotels. The UN Communication Group coordinated and facilitated the programme and prepared the speech and the talking points for the RC which he used for the Joint Press Briefing.
The UN Day was also celebrated with a series of event: a. a media dialogue on the MDGs b. the commemoration with representative from Civil Society in collaboration with the Global Campaign Againt Poverty c. a visit to the Millennium village d. a special supplement of 4 pages in This Day newspaper on the work of the UN and the MDGs e. Exhibition and publication stand on the UN Day at the UN House f. RC and other Head of Agency were invited for programmes on TV/Radio All activities, briefs and agenda were developed by the UNCG while a consultant was recruited to produce the 4-page supplement.
The world AIDS Day was commemorated with the Government – so mostly the UNCG gave technical support for the activities organized by the Government. Staff took part in a walk for HIV-AIDS prevention on November 30.
UN Agencies did not require support from the UNCG.
Not done. It has not been clear who is in charge of the website since the website was created without the support or the involvement of the UNCG. UNCG recommended that a consultant would be hired to be in charge of such task as it need regular attention and
A revised media kit covering the activities of all UN agencies in Nigeria with a focus on awareness-raising of MDGs was produced and distributed during the UN Week.
Only about 80 copies were produced due to late finalization of the content – it was not possible to send it to a printer. The concept note was not developed.
Campaign not conducted – however support was given to the Global Campaign Against Poverty for the Stand up -Speak out day.
The UNCG held a media workshop on MDG reporting at Abeokuta as part of the UN Week. A total of 35 leading journalists from print and audio/visual media organisations participated in it.
UNCG produced a special newspaper supplement for UN Day and World AIDS Day, on MDGs which was carried in a major national daily and a weekly magazine. Also articles on HIV-AIDS were produce and published for the World AIDS Day on HIV-AIDS.
RC was involved in media programme or media interviews for the International Women Day and the UN Week. The UNIC director spoke in a TV programme on the International Day of Peace, and gave TV, radio and newspaper interviews on the occasions of “Stand up against Poverty” campaign, media workshop on MDGs, UN Day and Human Rights Day.
One press briefing and one media dialogue were conducted for the International Women Day and the UN Week
media visit were arranged to the Millenium village as well as to UNFPA, UNICEF and FAO project site and more than 8 stories were published. The RC participated in the visit to the Millennium Village in Pampaida and widely covered by the media.
The UNCG launched a UN Newsletter covering the activities in the country of all UN agencies “delivering as One”. It was produced every month with contribution from all agencies. |
|
$25,000.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Joint UNCT Resource Mobilization Strategy |
|
Development/implementation of RM strategy
|
Resource mobilisation strategies for UNDAFII developed and documented
UN System coordination for sectoral donor coorination groups functional HIV/AIDS: UNAIDS, Gender: UNIFEM, Avian Influenza: UNRCO) |
UN agencies indicate expenditure on UNDAF outcomes Joint Programmes & other areas of joint/coordinated work indicate resource requirements Gaps identified & RM produced |
Resource mobilization framework under UNDAFII in place |
|
$1,500.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Result Area 3: Non-Resident UN Agencies |
| Special measures to integrate non-resident UN agencies in UNCT processes |
|
Supporting the Involvement of non-resident UN agencies in the national strategic planning processes/ UN programming
|
Based on survey undertaken in 2006 strategy to be developed by PMT |
Number of agenda items of PMT on NRAs NRA involvement in preparation of CCA/UNDAF & JPs |
Non Resident Agencies (NRA) Coordination Specialist Recruited and NRAs mainstreamed into UNCT work and activities |
|
|
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Result Area 4: Coordination Capacity of the UNCT |
| Strengthening UNCT Coordination Capacity |
|
RCO Staffing
|
RCO that supports RC & UN Coordination in place |
RCO reviewed Terms of Reference for RCO produced & endorsed by UNCT Work plan developed |
RCO that supports RC & UN Coordination in place |
|
$2,000.00 |
|
|
|
|
|
|
|
|
30/06/2007 |
|
|
|
Materials/Equipment
|
Profile of One UN strengthened |
Documents & items produced |
See UN Communication Group results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Training of UN staff
|
Qulaity CCA/UNDAF incorporating HRBA, RBM etc produced
UNCT Retreat |
UNCT oriented Ongoing training for UN programme staff undertaken
RC annual work plan 2007 reviewed, UNDAF annual eveluation reviewed, priorities for 2008 work plan developed |
2 training workshops on HRBA and RBM covering over 50 UN staff and government counterparts organized |
|
$15,000.00 |
|
|
|
|
|
|
|
|
|
|
31/12/2007 |
|
Other
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| TOTAL |
|
|
|
$0.00 |
$119,000.00 |
$0.00 |
$0.00 |
$0.00 |
$0.00 |
$60,000.00 |
$0.00 |
|
|
|
|
|
Joint Programmes
| Joint Programmes |
| Title |
Theme |
Linkages to MDGs and UNDAF outcomes |
Duration (from/to) |
Fund management Modality |
Manag. agent |
Admin. agent |
National or local partners and donors |
Total budget |
Financial contribution |
| JOINT PROGRAM ON TARABA LEADERSHIP |
Poverty reduction |
Linked to MDG goal 1 - 7 and UNDAF Outcomes Linked to UNDAF outcomes 1, 2 and 4 |
2006 - 2007 |
Pass-through
|
UNHCR |
UNHCR |
National Refugee Commission |
$2,024,555.00 |
|
Coordination Procedures and Practices
| Coordination practices and procedures |
| CP |
Results |
Recommendations to DGO |
| 1. The UN in Nigeria has invested in the development of new tools, in the context of the formulation of its new UNDAF, to better embed UNDAF Results into the individual Agency Programs. For each of our four results matrices, the UN is devising a Strategic Program Framework (SPF).
SPFs are an intermediate layer between the results (outcomes and outputs) in the UNDAF matrices and agency-specific country programme documents, biennium programmes or projects and joint programmes. This intermediate layer is intended to provide details on the specific operational arrangements, through which the UNCT plans to achieve results in each of the four strategic priority areas
To be sure, the SPF will detail exactly how the UNCT will pull together and organize the technical and financial capabilities of its constituent agencies to ensure that outputs are achieved and progress is made towards agency outcomes.
2. 2007 saw the setting up of an inter-agency Program Management Team (PMT). Reporting to the UNCT, the PMT serves as the central body of the UN in Nigeria for the planning and monitoring of development policy and programmatic collaboration across all agencies. Under the leadership of the UNCT, the PMT has played a key role in the formulation of the UNDAF.
|
Transaction costs: | 1. The SPF concept has been developed to avoid two major problems that have cropped up in the implementation of many UNDAFs: first, that, from a programmatic standpoint, agencies tend to end up going their own way after the UNDAF is formulated with the exception of participation in a few, relatively modest, joint programmes; and, second, that there is usually a lack of reflection in the UNDAF on the challenges facing the UNCT in achieving results and its ideas for addressing them. The consequence of these shortcomings is usually fragmentation, a diffused identity and, ultimately, ineffective development performance.
2. High coordination costs for common programming and the risk of a rapid loss of institutional memory built up in the course of the common country programming process |
Lessons gained from the roadtesting of the new UNDAF guidlines should be captured. While an important step in the right direction, the new guidlines still require more elaboration with regards to operational arrangements underpinning the Results statements.
Countries could usefully be provided with a 'institutional space' within which to share and learn from programmatic innovations and adaptations evolved at country level.
|
| Achievements: | 1. SPFs are intended to complement existing arrangements and expected benefits including a stronger common accountability framework for results and a clearer delineation of roles and resposibilities in the implementation process.
2. Lowering of coordination costs and a more equitable spread of programming responsiblities across staff and agencies. |
| Lessons learned: | - Sustained investments in training, targeting a small but competent number of CO staff in Common Programming tools has a very high rate of return.
- When in doubt about how to proceed with the operationalization of the guidlines: improvise, improvise, improvise!
- Balance the need to forge a small and cohesive team of senior program officers under the auspices of the RC Unit, for the purpose of bringing the various parts of the UNDAF formulation process together, with the need to have a broader institutional structures (e.g. a PMT) fostering a culture of inclusiveness in the preparation and review of the Results. |
2008 Workplan
| UNDAF Outcomes |
| 1. Strengthened national capacity to ensure access to quality health care systems for all Nigerians | |
| 2. People empowered through education | |
| 3. Institutional capacity built to plan, implement and manage multi-sectoral strategies at both national and sub national levels to limit the spread of HIV/AIDS and mitigate its social and economic impact on poor people and women and children. | |
| 4. Strengthened national capacity to plan, monitor and coordinate national development; promote human rights, particularly for women; promote democratic processes and accountability in governance, and promote peace and respond to emergencies | |
| 5. Enhanced capacity for national production and productivity for agriculture, industry and services | |
| 2008 Workplan |
| KEY RESULTS AREA |
Expected Outputs |
Perf. Indicators |
Actual Outputs at Year End |
Funds required/spent at Year End |
Additional support needed from HQ or Regional Director's Team |
Target Date |
| SRC |
UNCCF |
UN Agencies |
Other |
| Req |
Spt |
Req |
Spt |
Req |
Spt |
Req |
Spt |
Q1 |
Q2 |
Q3 |
Q4 |
| Coordination for Results (WORKPLAN08) |
| UNCT Contribution to the National Development Plan/Poverty Reduction Strategy |
UN support to formulation/implementation of relevant national strategies or plans e.g. JAS/NDP/PRSP |
Development of implementation strategy for NEEDS 2 supported
|
• Strategy document developed
|
Strategy document outlining the UNs support to the implementation of NEEDS 2 developed
|
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
30/09/2008 |
|
UN plan to support the implementation of the Millennium Declaration and/or the UNDG Action Plan on the Development Outcome of the World Summit 3 (MDG Action Plan) * |
UN plan to support the implementation of the Millennium Declaration and/or UNDG Action Plan on the Development Outcome of the World Summit 3 (MDG Action Plan) |
Plan developed |
Plan developed and in place |
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
30/09/2008 |
|
UN support to capacity development strategies |
Capacity Development strategy-making process supported |
• Strategy document developed |
Strategy document to support the development of capacity document developed and in place |
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
30/09/2008 |
|
UN assistance to national authorities for the preparation of the national report on the implementation of the Brussels Programme of Action of LDCs 4 * |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Formulation/implementation of a transition plan or strategy 5 |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Aid Coordination / Management / Paris Declaration |
Planned efforts to making use of national systems in the areas such as programme/project reporting, PRS/sectoral monitoring and evaluation systems, annual PRS/sectoral performance reviews, national procurement systems, etc |
|
|
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
UN support to aid coordination/management |
Aid coordination and management framework development supported |
• Strategy document developed |
Strategy document outlining the UNs support to the strengthening of the aid coordination and management framework developed |
$20,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| UNDAF/Common Programming |
Efforts to align UN programme cycle with national development cycle * |
UNDAF II prepared and validated by national counterparts |
Completed UNDAF prepared and submitted |
UNDAF II document completed |
$15,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
30/06/2008 |
|
|
Preparation of CCA/UNDAF |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Implementation of UNDAF M&E framework * |
UNDAF M&E framework developed and in place |
• Completed UNDAF prepared and submitted |
UNDAF II implementation arrangements are developed and their operationalization supported. |
$20,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
30/06/2008 |
|
|
UNDAF Annual Review/ UNDAF Evaluation |
|
|
|
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Joint Programmes |
Preparation/ implementation of new Joint Programmes * |
New Joint Programme formulated |
• Programme Management Team & UN Learning Team on HIV/AIDS supported and operational • RC Unit ‘project document’ upgraded • ‘UNCT organizational chart’ defining institutional architecture of all UN inter-agency bodies in Nigeria developed |
UNDAF II implementation arrangements are developed and their operationalization supported. |
$20,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
30/06/2008 |
|
|
M&E of Joint Programmes |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| HACT |
Plan for the roll-out/implementation 7 of HACT in the country * |
National and UN system HACT implementation capacity developed |
Capacity development strategy for HACT implementation developed and operationalized |
UN and National capacities supporting full implementation developed |
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
30/09/2008 |
|
Strengthening national systems/capacities through HACT |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Gender Equality |
UN support to incorporation of gender equality in national planning processes (such as National Development Strategies; PRSPs; SWAPs; Joint Assistance Strategies, etc.) |
Institutional framework coordinating the UNs support to the engendering of national planning processes functional |
Workplan milestones achieved |
Gender Theme group 2008 workplan operatationalized |
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Capacity development for Gender theme groups to support UNCT to respond to national priorities for gender equality. |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| HIV/AIDS |
Establishment of Joint UN Team on AIDS and implementation of joint programme of support on AIDS * |
Institutional framework supporting the implementation of joint programme of support on AIDS functional |
Workplan milestones achieved |
Joint UN Theme Group on AIDS 2008 workplan operationalized |
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
UN support to the national response to AIDS through strengthening the Three Ones * |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
HIV/AIDS in the Workplace |
UN staff sensitized on HIV/AIDS in the workplace |
Workplan milestones achieved |
UNLT 2008 workplan operationalized |
$10,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Human Rights |
Application of Human Right Based Approach |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Strengthening the capacity of UNCTs to support national human rights protection systems |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Coordination of Humanitarian/Natural Disaster Operations |
Coordination of humanitarian operations |
Institutional framework ensuring a coordinated UN reponse to Emergency Preparedness and Response in place |
Workplan milestones achieved |
Emergency Preparedness and Response Working Group 2008 worplan operationalized |
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Preparation of crisis prevention/natural disaster operations/plans |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Contingency Plan initiatives |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
Institutional framework ensuring a coordinated UN management and response to the risk of AHI operationalized |
UN Avian Influenza Contingency Plan including RM strategy finalized and implemented |
UN Avian Influenza Contingency Plan including Resource Mobilization strategy finalized and implemented |
$25,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
| Security |
Security Management Team |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
UNCT Security Plan |
UNCT Security Plan implemented |
Workplan milestones achieved |
SMT 2008 Workplan operationalized |
$5,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Common Services and Premises |
Planned initiatives to increase cost-effectiveness of UN operations, incl. common administrative services and common arrangements in support of programme delivery (including Joint Office initiative) |
Management of common services and the common premise streamlined |
Workplan milestones achieved |
2008 Operations Management Team Workplan operationalized |
$0.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Planned initiatives on common premises |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Other (specify) |
Other (specify) |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| UN Advocacy and Resource Mobilization (WORKPLAN08) |
| Joint UNCT Advocacy and Communications |
Development/implementation of the UNCT communications/advocacy strategy & plan |
Institutional framework supporting the crafting and dissemination of core UN messages in place |
Workplan milestones achieved |
2008 UN Communication Group operationalized |
$25,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Joint UNCT Resource Mobilization Strategy |
Development/implementation of RM strategy |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Non-Resident UN Agencies (WORKPLAN08) |
| Special measures to integrate non-resident UN agencies in UNCT processes |
Supporting the Involvement of non-resident UN agencies in the national strategic planning processes/ UN programming |
Non-resident agencies mainstreamed into UNCT work and activities |
Document providing a project framework for the Non-Resident Agency (NRA’s) Coordination function in place and operationalized Framework document supporting the establishment of a comprehensive database on the activities of NRAs in Nigeria developed Advocacy strategy to increase the visibility of NRA’s developed Communication strategy to facilitate the coordination between NRAs and RAs developed Resource mobilization strategy to raise funds for execution of selected NRA related initiatives developed |
Strategy documents supporting the meaningful and sustainable inclusion of NRA into the UNCTs work developed, adopted and implemented |
$20,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
Other |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
| Coordination Capacity of the UNCT (WORKPLAN08) |
| Strengthening UNCT Coordination Capacity |
RCO Staffing |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Materials/Equipment |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Training of UN staff |
|
|
|
| |
| |
| |
| |
|
|
|
|
|
Other |
Coordination capacity supporting the UNCT and its subsidiary organs in place |
Number of UNCT and subsidiary organs related activities organized Project document developed |
RC Unit ‘project document’ [detailing RC Unit mission, roles & responsibilities] upgraded and operationalized |
$30,000.00 | |
$0.00 | |
$0.00 | |
$0.00 | |
|
|
|
|
31/12/2008 |
|
| TOTAL |
|
|
|
|
$250,000.00 |
|
$0.00 |
|
$0.00 |
|
$0.00 | |
|
|
|
|
|
|
| | |